HOME » Experiences » 

Renovation of SMOT Classrooms at Matthayom Wat That Thong School

Renovation of SMOT Classrooms at Matthayom Wat That Thong School

This project involved the renovation of four SMOT (Special Science and Mathematics) classrooms at Matthayom Wat That Thong School.

Our team managed the renovation design concept and execution. The scope of work included:

  • Installation of a front classroom board with a whiteboard.
  • Repainting the ceiling, interior, and exterior walls.
  • Installation of sliding glass doors.
  • Construction of a front-of-room stage.
  • Installation of vinyl tile flooring and application of subterranean termite treatment.
  • Application of tea-colored film to the glass.
  • Installation of LED light panels.
  • Installation of die-cut acrylic lettering.
  • Installation of a complete audio system, including a TOA-brand amplifier, speakers, and microphones.
  • Production and installation of lockers and waste/equipment cabinets.
  • Procurement of desk sets, chairs, and shoe racks.
  • Procurement and installation of an 86-inch Hoshi Interactive Board.

We extend our sincere gratitude to Matthayom Wat That Thong School for this opportunity. Our team was dedicated to perfecting every detail to ensure complete client satisfaction.

📞 Interested in Our Services?
Feel free to contact us anytime — our admin team is always available to assist you.

📱 Phone: 02-878-0990 ext. 15 / 086-992-4646
💬 Line: @theinfinitygrand (https://lin.ee/hOavv5O)
📧 Email: admin@theinfinitygrand.co.th
📘 Facebook: theinfinitygrand
🌐 Website: https://theinfinitygrand.co.th